{"id":11845,"date":"2015-02-23T12:00:00","date_gmt":"2015-02-23T09:00:00","guid":{"rendered":"https:\/\/vo.afonico-test.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/"},"modified":"2015-02-23T12:00:00","modified_gmt":"2015-02-23T09:00:00","slug":"rpv-installation-work-starts-at-novovoronezh-7","status":"publish","type":"post","link":"https:\/\/vosafety.ru\/en\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/","title":{"rendered":"RPV installation work starts at Novovoronezh 7"},"content":{"rendered":"<h4><strong>Russian architect-engineer AtomEnergoProekt (AEP) has started work to install the reactor pressure vessel of the second unit of the Novovoronezh II nuclear power plant. The unit is also known as Novovoronezh 7.<\/strong><\/h4>\n<p>AEP said on 20\u00a0February that installation of the 330-tonne RPV is carried out in two stages. In the first, the RPV was raised with a DEMAG crane to the transport portal at a height of 26.3\u00a0metres and moved into the pressurized zone. DEMAG cranes are made by Cleveland, Ohio-headquartered Terex MHPS Corp.<\/p>\n<p>In the second phase, which is scheduled for early March, the RPV will be installed with the help of a polar crane that is currently undergoing a registration procedure after having completed tests two weeks ago. The 360-tonne crane is located under the containment dome on a trolley that moves 360\u00b0 on a circular rail over the reactor shaft.<\/p>\n<p>Novovoronezh II is the lead project for the deployment of the AES-2006\u00a0design incorporating a Gidropress-designed pressurized water reactor, an evolutionary development from the VVER-1000. Construction of Novovoronezh II units 1\u00a0and 2, also known as Novovoronezh units 6\u00a0and 7, began in June 2008\u00a0and July 2009, respectively. The original Novovoronezh site nearby already hosts three operating reactors and two that are being decommissioned.<\/p>\n<p>Rosenergoatom, the nuclear power plant operating subsidiary of Russian state nuclear corporation Rosatom, said on 29\u00a0January it had commissioned the turbine building of unit 6\u00a0as it prepares the unit for first criticality. Delivery of nuclear fuel to the site is scheduled for the second quarter of this year, hot and cold testing of the reactor is scheduled for May, with start-up to follow later this year. Unit 7\u00a0is expected to be commissioned in 2017.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Russian architect-engineer AtomEnergoProekt (AEP) has started work to install the reactor pressure vessel of the second unit of the Novovoronezh II nuclear power plant. The unit is also known as Novovoronezh 7. AEP said on 20\u00a0February that installation of the 330-tonne RPV is carried out in two stages. In the first, the RPV was raised&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15],"tags":[],"class_list":["post-11845","post","type-post","status-publish","format-standard","hentry","category-novosti-otrasli"],"translation":{"provider":"WPGlobus","version":"3.0.6","language":"en","enabled_languages":["ru","en"],"languages":{"ru":{"title":true,"content":true,"excerpt":false},"en":{"title":false,"content":false,"excerpt":false}}},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.5 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/\" \/>\n<meta property=\"og:site_name\" content=\"JSC \u201cVO \u201cSafety\u201d\" \/>\n<meta property=\"article:published_time\" content=\"2015-02-23T09:00:00+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/#\\\/schema\\\/person\\\/59a2ff5228288f09354f468b746938fc\"},\"headline\":\"RPV installation work starts at Novovoronezh 7\",\"datePublished\":\"2015-02-23T09:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/\"},\"wordCount\":279,\"commentCount\":0,\"articleSection\":[\"\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u043e\u0442\u0440\u0430\u0441\u043b\u0438\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/\",\"url\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/\",\"name\":\"RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vosafety.ru\\\/#website\"},\"datePublished\":\"2015-02-23T09:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/vosafety.ru\\\/#\\\/schema\\\/person\\\/59a2ff5228288f09354f468b746938fc\"},\"description\":\"JSC \u201cVO \u201cSafety\u201d - RPV installation work starts at Novovoronezh 7\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/novosti-otrasli\\\/rpv-installation-work-starts-at-novovoronezh-7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\\\/\\\/vosafety.ru\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RPV installation work starts at Novovoronezh 7\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/#website\",\"url\":\"https:\\\/\\\/vosafety.ru\\\/\",\"name\":\"JSC \u201cVO \u201cSafety\u201d\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vosafety.ru\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/vosafety.ru\\\/#\\\/schema\\\/person\\\/59a2ff5228288f09354f468b746938fc\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/","og_locale":"en_US","og_type":"article","og_title":"RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d","og_url":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/","og_site_name":"JSC \u201cVO \u201cSafety\u201d","article_published_time":"2015-02-23T09:00:00+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/#article","isPartOf":{"@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/"},"author":{"name":"admin","@id":"https:\/\/vosafety.ru\/#\/schema\/person\/59a2ff5228288f09354f468b746938fc"},"headline":"RPV installation work starts at Novovoronezh 7","datePublished":"2015-02-23T09:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/"},"wordCount":279,"commentCount":0,"articleSection":["\u041d\u043e\u0432\u043e\u0441\u0442\u0438 \u043e\u0442\u0440\u0430\u0441\u043b\u0438"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/","url":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/","name":"RPV installation work starts at Novovoronezh 7 - JSC \u201cVO \u201cSafety\u201d","isPartOf":{"@id":"https:\/\/vosafety.ru\/#website"},"datePublished":"2015-02-23T09:00:00+00:00","author":{"@id":"https:\/\/vosafety.ru\/#\/schema\/person\/59a2ff5228288f09354f468b746938fc"},"description":"JSC \u201cVO \u201cSafety\u201d - RPV installation work starts at Novovoronezh 7","breadcrumb":{"@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/vosafety.ru\/novosti-otrasli\/rpv-installation-work-starts-at-novovoronezh-7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/vosafety.ru\/"},{"@type":"ListItem","position":2,"name":"RPV installation work starts at Novovoronezh 7"}]},{"@type":"WebSite","@id":"https:\/\/vosafety.ru\/#website","url":"https:\/\/vosafety.ru\/","name":"JSC \u201cVO \u201cSafety\u201d","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vosafety.ru\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/vosafety.ru\/#\/schema\/person\/59a2ff5228288f09354f468b746938fc","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6ccc980f5b68fb26f18fe24792459a7167cc5b48762e5b06c3877ca35f80cabf?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/posts\/11845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/comments?post=11845"}],"version-history":[{"count":0,"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/posts\/11845\/revisions"}],"wp:attachment":[{"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/media?parent=11845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/categories?post=11845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vosafety.ru\/en\/wp-json\/wp\/v2\/tags?post=11845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}